Tel: +264 (61) 302012
Tel: +264 (61) 302012
Building services and Site Reticulation for the new NTA campus in Gobabis, Namibia
Year: 2018 - Current
Building services for two retails outlets
Wanaheda and Luderitz, Namibia
Year: 2017
Building Services for Tenant Fit-out
Windhoek, Namibia
Year: 2017-2018
Continual Energy Metering & Monitoring Services
Private residence
Nairobi, Kenya
Year: 2017-2018
Power Quality studies, 11 kV metering and new 1600 kVA 11/0.4 kV transformer
Otavi & Windhoek, Namibia
Year: 2015-2017
Building services for new factory
Shali Industrial, Brakwater, Namibia
Year: 2017-2018
Continual Energy Metering & Monitoring Services
Site reticulation for new residential development
Katima Mulilo, Namibia
Year: 2018 - Current
Year – 2011
Savings - ± N$ 300 000 per annum
Cost - ± N$ 200 000
Payback - ± 8 months
Year – 2011
Savings - ± N$ 360 000 per annum
Cost - ± N$ 200 000
Payback - ± 7 months
Year – 2012
Savings - ± N$ 297 000 per annum
Cost - ± N$ 300 000
Payback - ± 12 months
Year – 2014
Savings - ± N$ 82 000 per annum
Cost - ± N$ 79 000
Payback - ± 12 months
Year – 2017
Savings - ± N$ 105 000 per annum
Cost - ± N$ 105 000
Payback - ± 12 months
Year – 2018
Savings - ± N$ 235 200 per annum
Cost - ± N$ 184 000
Payback - ± 10 months
50 kWp rooftop system
Design and implementation
Two Phases
Year: 2022 - Current
42 kWp system on parking roofs
Design and implementation
Three Phases
Year: 2015-2022
500 kWp ground-based and/or rooftop system
Contract documentation for possible PPA
Year: 2015
500 kWp rooftop system
Design only
Year: 2017
23 kWp rooftop system
Design and implementation
Year: 2017
25 kWp Rooftop system
Design only
Year: 2017
South Africa
Botswana electrical engineering
Kenya alternative energy
Namibia